Eco Garden Bridge 2
Eco Garden Bridge 2
Eco Garden Bridge 1
Eco Garden Bridge 1

 
DESIGN & BUILD / RE-ENGINEERING
  • Cast In situ post tensioned balance cantilever bridge using steel traveller form
  • Cast in situ reinforced concrete box girder using heavy duty shoring
  • Cast in situ post tensioned beams, suitable for curve bridge
  • Incremental launching post tensioned bridge, bridge is cast near the shore and push outward to the pier
  • Approach Bridge Structure
  • Pre-tensioned Bridge
  • Post-tensioned Bridge

view more »

Current Project
SWIMMING POOL I-PARK SAC
SAC I-PARK HQ CLUBHOUSE- SWIMMING POOL & REFLECTIVE POOL
 
Progress:   30%
Client:   IPARK DEVELOPMENT SDN BHD
Main-Con:   AME CONSTRUCTION SDN BHD
Sub-Con:   S. P. MULIA SDN BHD

 

swimming pool_01
swimming pool_02
swimming pool_03
swimming pool_04
swimming pool_05
swimming pool_06
swimming pool_07
swimming pool_08
swimming pool_09
swimming pool_10
TAMAN GAYA ZONE 4B3
PROPOSED EXECUTION AND COMPLETION OF ROAD, DRAINAGE SEWERAGE RETICULATION WORKS AND ASSOCIATED WORKS FOR ZONE 4B3 AT LOT 1080, TAMAN GAYA, MUKIM TEBRAU, DAERAH JOHOR BAHRU. JOHOR DARUL TAKZIM.
FOR MESSRS ATLANTIC DYNAMICS SDN. BHD.
Progress   10%
Client:   MESSRS ATLANTIC DYNAMICS SDN. BHD.
Main-Con:   JURAGAN JAYA SDN BHD
Sub-Con:   S. P. MULIA SDN BHD

 

TAMAN GAYA ZONE 4B3_001
TAMAN GAYA ZONE 4B3_002
TAMAN GAYA ZONE 4B3_003
TAMAN GAYA ZONE 4B3_004
BRIDGE MASAI

CONSTRUCTION AND COMPLETION OF BRIDGE CROSSING OVER SENAI-DESARU EXPRESSWAY FOR HOUSING DEVELOPMENT ON LOT PTD 206733 & PTD 236245, MUKIM PLENTONG, DAERAH JOHOR BAHRU, JOHOR DARUL TAKZIM FOR MESSRS PARKLAND CITY SDN BHD

Progress:   10%
Client:   PARKLAND CITY SDN BHD
Main-Con:   S. P. MULIA SDN BHD

 

BRIDGE MASAI_001
BRIDGE MASAI_002
BRIDGE MASAI_003
BRIDGE MASAI_004
BRIDGE MASAI_005
BRIDGE MASAI_006
BRIDGE MASAI_007
BRIDGE MASAI_008
BRIDGE MASAI_009
BRIDGE MASAI_010
BRIDGE MASAI_011
BRIDGE MASAI_012
Copyright © 2012 S.P.MULIA SDN BHD