Eco Garden Bridge 2
Eco Garden Bridge 2
Eco Garden Bridge 1
Eco Garden Bridge 1

 
DESIGN & BUILD / RE-ENGINEERING
  • Cast In situ post tensioned balance cantilever bridge using steel traveller form
  • Cast in situ reinforced concrete box girder using heavy duty shoring
  • Cast in situ post tensioned beams, suitable for curve bridge
  • Incremental launching post tensioned bridge, bridge is cast near the shore and push outward to the pier
  • Approach Bridge Structure
  • Pre-tensioned Bridge
  • Post-tensioned Bridge

view more »

Current Project
SWIMMING POOL I-PARK SAC
SAC I-PARK HQ CLUBHOUSE- SWIMMING POOL & REFLECTIVE POOL
 
Progress:   30%
Client:   IPARK DEVELOPMENT SDN BHD
Main-Con:   AME CONSTRUCTION SDN BHD
Sub-Con:   S. P. MULIA SDN BHD

 

swimming pool_01
swimming pool_02
swimming pool_03
swimming pool_04
swimming pool_05
swimming pool_06
swimming pool_07
swimming pool_08
swimming pool_09
swimming pool_10
Copyright © 2012 S.P.MULIA SDN BHD